본문으로 건너뛰기
OpenEnergy

RE100 transition that lowers your power bill.

Upload a single bill, and EnergyBridge handles everything from diagnosis to contract on your behalf.

Upload Bill

No signup · No card required

VERIFIED TEAM

Operated by a team validated by KEPCO.

Korea Electric Power Corporation

KEPCO Intrapreneurship

EnergyBridge is operated by OpenEnergy, launched through the KEPCO intrapreneurship program.

Our team has hands-on experience with power trading structure and tariff systems. Disclosure data and spot price analysis are only meaningful when grounded in real market-structure expertise.

Validation & Support

환경부
청년사관학교
창업진흥원
동서발전
와이앤아처
PTT 그룹
환경부
청년사관학교
창업진흥원
동서발전
와이앤아처
PTT 그룹
  • Selected — Ministry of Environment Eco Startup Program
  • Selected — Korea SMBA Young Entrepreneur Academy
  • Top Performer — KISED Pre-Startup Package
  • Selected — Korea East-West Power E-SPARK Program

PRICE & IMMEDIACY

Live data — not a snapshot.

Multi-million-won consulting reports, delivered free and in real time.

Legacy ConsultingEnergyBridge
Diagnosis costMillions of wonFree
DataSnapshot PDFLive dashboard
TurnaroundWeeks3 minutes
OutputStaticContinuously updated
ExecutionDiagnosis onlyPPA · REC execution

KPX SMP

148.7₩/kWh +2.1%

REC Spot

72,400 -0.8%
Live · updated 12s ago

※ Diagnosis is permanently free. Fees apply only when a delegation contract is signed.
※ "Millions of won" reflects industry-average consulting quotes.

JOURNEY

From diagnosis to contract — one team, end-to-end.

Free Diagnosis

Upload Bill

Upload your last 12 months of electricity bills (PDF). Company name and contact email are collected at the same time.

RE100 Report in 3 minutes

AI generates the diagnosis automatically. Delivered to your inbox and a private link instantly.

You decide whether to delegate after reviewing the diagnosis.

Delegation Review (Optional)

Sign Delegation Contract

Review the scope and terms, then sign the delegation contract.

PPA · REC Execution

EnergyBridge represents your company in supply negotiations, procurement, and contract drafting.

Transition Complete

The delegation ends once the RE100 transition is confirmed and contracts are executed.

REPORT PREVIEW

This is the diagnosis report you receive.

Actual result-page layout. Company name and figures are illustrative.

RE100 Diagnosis Report

○○○ Corp.

Manufacturing · Gyeonggi · Industrial (Class B) · Contract power 8,000 kW

Current RE100 rate

73%

27%p remaining to 100%

Annual savings

₩12.4M

▼ 18.3%

Renewable shortfall

2,180MWh

Annualized

Recommendation

Mixed

PPA + REC

RE100 Transition Roadmap

Now → Year 1 → Year 2

Now 73%Year 1 85%Year 2 100%

PPA-led

Annual cost₩8.2M/yr
Coverage100%
Execution6–9 months

REC-led

Annual cost₩14.6M/yr
Coverage100%
Execution1–2 months

Mixed (Recommended)

Recommended
Annual cost₩12.4M/yr
Coverage100%
Execution3–6 months

FAQ

Final questions before you start.

Q.How is this free?

Diagnosis is permanently free. EnergyBridge earns revenue only from fees on signed delegation contracts. You may use the diagnosis results without delegating.

Q.Does KEPCO see our company data?

EnergyBridge is operated by OpenEnergy, a separate corporate entity from KEPCO. Customer data is stored in isolation on domestic Korean servers and is never shared with KEPCO.

Q.Can we skip the delegation?

After receiving the diagnosis, the decision to delegate is entirely yours. There is no obligation — the report alone is usable for in-house negotiation.

Q.How is this different from traditional consulting?

Traditional: snapshot PDF report (millions of won), diagnosis only. EnergyBridge: live dashboard (free), then PPA · REC execution on your behalf.

Start your RE100 transition — beginning with a diagnosis.

Run the free diagnosis first. Decide on delegation once you have reviewed the results.

Upload Bill

No signup · No card required

KEPCO IntrapreneurshipKorea-resident dataSource-cited from KPX · KEPCONo delegation obligation